The
Courses
1. An OSHA Trilogy
2. Applied Volume Calculations
3. Arithmetic
4. Caustic Soda
5. Chemistry Unit I
Chemistry in a Modern World
6. Chemistry Unit II
The Organization of Chemistry
7. Chemistry Unit III Water
and It's Elements
8. Chemistry Unit IV Chemical
Calculations
9. Chemistry Unit V
Ionization
10. Coagulation
and The Lamella Separator
11. Diesel Engine,
The
12. Electrodialysis
13. Filtration
14. Flow Measurement
15.
Groundwater Pollution,
Remediation & Groundwater Sampling Guidance
16.
Health and
Safety
17. Hydraulics and
Electricity
18. Membrane
Technology
19. Nitrification/ Denitrification
20. Pandemic
21. pH
Measurement
22. Physical/Chemical Treatment of Industrial
Wastewater
23. Plating
24. Pumps
25. Reduction/Oxidation
26. Rules and Regulations
27. Sewage Treatment
28. Unit
Operations Math and Leachate Treatment
29. Unit
Operations Math Module #1
30. Unit
Operations Math Module #2
31. Valves
32. Wastewater
Characteristics and Wastewater Sampling
33. Wastewater
Disposal Options
34.
Wastewater Indicators
35.
Wastewater
Sources (Part 1)
36. Wastewater
Sources (Part 2)
37. Wastewater
Sources (Part 3)
38. Wastewater
Treatment Methods and Disposal
39.
Wastewater Treatment Options (Part 1)
40.
Wastewater Treatment Options (Part 2)
|
________________________________________________________________________
providing
Easy to Learn Wastewater Treatment
Correspondence Courses
to complete
the
-
State of Massachusetts Department of
Environmental Protection's
-
State of New
Hampshire's Department of Environmental
Services
-
State of Vermont's
Department of Environmental Conservation
requirements to earn
annual Training Contact Hours (TCH) and/or Continuing Education
Units (CEU).
Sign up NOW and
complete your annual Wastewater Treatment Operator
(WWTO) training
requirements!
________________________________________________________________________
Applied Volume Calculations
MA Certification Board
File No. BC-2007-1863
TCH: 10 Hours
CEU: 1.0 Units
Price: $150.00
Contents
-
Applied Volume Calculations (summary)
-
Tank Volume Calculations
-
Channel/Pipeline Volume Calculations
-
Pit/Trench Volumes
-
Oxidation Ditch or Pond Volumes
-
When All Sides Slope
-
Flow and Velocity Calculations
-
Flow Through a Trapezoidal Channel
-
Flow into a Tank
-
Flow Through a Pipeline When Flowing
Full
-
Velocity Using the Float and Dye
Method
-
Using Q=AV to Estimate Changes in
Velocity
-
Average Flowrate Calculations
-
Flow Conversion Calculations
-
Quick Conversions
-
Chemical Dosage Calculations
-
Chorine Dosage, Demand and Residual
-
Chemical Dosage for Other Chemicals
-
Chemical Dosage in Wells, Tanks, Reservoirs
or Pipelines
-
Loading Calculations - BOD, COD and SS
-
BOD and SS Removal Calculations
-
Waste Activated Sludge Pumping Rate
Calculations
|